MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.

Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added., This news data comes from:http://www.gangzhifhm.com
- Palestinian Embassy echoes PH appeal for ceasefire in Gaza
- Lawmaker linked to anomalous flood control projects in US for medical reasons, says House spokesman
- Drug war whistleblower Royina Garma returns to PH after US detention
- 'Pink and green' protests call for a reset in Indonesia
- NBI slaps Alice Guo, 35 Others with new graft, misconduct cases
- PAL plane bound for Osaka returns to Manila due to 'emergency' situation
- Retired NBI agents urge Marcos to appoint career official to replace Santiago
- President pushes probe on flood control mess amid congressional inquiry
- UK, Japan, South Korea endure hottest summer on record
- Repairs on Chinese ship in Bajo de Masinloc collision may take 2 months - PH Navy